Parent Group
Location
Saray, Istanbul
GFA
~45,000 m²
Type
Corporate HQ
Responsible for the design and operation of the project's integrated Project Management Plan and Monthly Monitoring System, covering master coding, ERP-integrated cost control, progress measurement, schedule and cost performance indices, and executive-level reporting for a flagship corporate headquarters development.
Project Overview
The TEB Headquarters Campus is the flagship corporate headquarters for Türk Ekonomi Bankası (TEB), one of Turkey's leading private banks and a strategic partner of BNP Paribas, the eurozone's largest banking group.
Located in the Saray district of Istanbul, the campus comprises multiple interconnected office blocks with a total gross floor area of approximately 45,000 m², designed to consolidate the bank's central operations, technology infrastructure, and executive functions into a single integrated campus environment.
The project was delivered under a design-build contract, requiring close coordination between architectural design development, structural engineering, MEP systems integration, and interior fit-out to meet international banking standards for security, business continuity, and operational efficiency.
Summary Scope
Project controls framework for planning, monitoring, and reporting.
Project governance structure & responsibility framework
Master coding system (WBS–cost–schedule integration)
Unit price–based cost control methodology
Indirect cost and overhead analysis framework
Cost control integration with accounting / ERP system
Integrated progress measurement methodology
Cross-department data flow and information integration
Executive KPI and decision framework definition