Client
Istanbul Metro
Contractor (JV)
Yapı Merkezi / Doğuş / Yenigün
Project Value
$1.2B+ (Line Total)
Tunnel Length
21.7 km
Stations
16 Underground
Method
EPB-TBM + NATM
Responsible for the design and operation of the project's integrated Project Management Plan and Monthly Monitoring System, covering master coding, ERP-integrated cost control, progress measurement, schedule and cost performance indices, and executive-level reporting for a TBM-driven metro project.
Project Overview
The Kadıköy-Kartal Metro Project (M4 Line) is a major urban transit infrastructure initiative on the Asian side of Istanbul, Turkey, designed to relieve congestion on the D-100 (E-5) corridor and significantly improve mass transit connectivity from Kadıköy to Kartal station.
Originally awarded to the Anadoluray joint venture (formed by Yapı Merkezi, Doğuş İnşaat, and Yenigün İnşaat) in 2005, construction began in February 2005 and focused on the Kadıköy-Kozyatağı section—including deep TBM tunnels and station caverns.
Despite complex urban geology, constrained rights-of-way, and evolving design requirements, the project progressed as a foundational component of Istanbul's metro network, supporting multimodal connectivity and enhancing mobility in one of Europe's largest megacity environments.
Summary Scope
Project controls framework for planning, monitoring, and reporting.
Project governance structure & responsibility framework
Master coding system (WBS–cost–schedule integration)
Unit price–based cost control methodology
Indirect cost and overhead analysis framework
Cost control integration with accounting / ERP system
Integrated progress measurement methodology
Cross-department data flow and information integration
Executive KPI and decision framework definition